Home / Manufacture

ZIESHINE

How brands build
with ZIESHINE.

Activewear, swimwear and knit programmes, cut and sewn on our own Dongguan floor. Start from a sketch or a full tech pack — every desk below answers MOQ, sample, fabric, fit, QC and compliance first.

ZIESHINE sewing floor with TEGOTE hanger line in Humen, Dongguan Our floor · Humen, Dongguan TEGOTE hanger line 200+ people · ~200k pcs / month installed Walk the floor →
150
Standard MOQ / style / colour
from 100
Selected library trial
US$50–100
Sample per garment piece
7–9 days
Sample lead time
25–30 days
Bulk after PPS

Standard 150 pcs / style / colour · library trial from 100 · below 100 +15%.

The floor

Walk the floor.
Then pick the desk.

200+ people and about 200,000 pcs / month of installed cut-and-sew capacity in Humen, Dongguan. Fabrics are co-developed with specialist mills — we do not own knitting or dyeing — then cut, sewn, checked and packed here.

Cutting
CNC cutting tables
Sewing
4-needle 6-line flatlock · coverstitch on Yamato & HIKARI
Flow
TEGOTE hanger lines
Start from
Design images, sketches, simple files or a full tech pack
Company Fact Sheet →
CNC cutting table on the Dongguan floor
CNC cutting
Sewing station on the ZIESHINE floor
Sewing station
Sample room with dress form
Sample room

Manufacturer desks

Pick your category desk.

Each desk opens with MOQ, sample, fabric, fit, QC and compliance — the questions a buyer asks before the pitch.

How a programme runs

From brief to bulk in four gates.

One desk owns the brief from first sketch to shipment. Nothing moves to bulk without an approved PPS.

  1. 01

    Brief

    Design images, sketches or a tech pack — plus target fabric, market and quantity.

  2. 02

    Sample

    7–9 working days · US$50–100 per garment piece, depending on construction and fabric.

  3. 03

    PPS

    Pre-production sample on bulk fabric and trims. 30% deposit after PPS approval.

  4. 04

    Bulk

    Typically 25–30 days after PPS (swim 30–40). 70% balance after final inspection.

Standard 150 pcs / style / colour · library trial from 100 · below 100 +15%.

The full fabric-to-garment process — seven stages, seven signed gates →

By style

Or start from the style.

Style pages only exist where the library already proves the construction — photographed blocks, not placeholders.

Programme reconstructions

Six programmes, reconstructed.

Buyer types we serve, built on photographed library blocks. Not named clients — figures match the Company Fact Sheet.

All programmes, including rescues →

Next step

Send the brief. Get MOQ, sample and timeline back.

Export desk replies within 12 hours (GMT+8).