Critical path · approvals · versions

How we keep a programme from drifting.

Most delays are approval delays. This is the gate map we run with product managers.

Critical path (with buffer)

Brief / pack intake → sample (7–9 wd) → fit loop → colour / trim lock → PPS → deposit → bulk (~25–30 days; swim 30–40) → AQL → ship.

  • Build buffer before PPS if multiple size runs are required.
  • Do not start bulk fabric against an unsigned colour.
  • Capacity windows are shared on enquiry — ask early for peak months.

Approval matrix

We need named owners. Ambiguous “team OK” is how POM drifts.

  • Fit owner signs fit sample / POM sheet.
  • Colour owner signs dip / swatch ID.
  • PPS owner signs construction + BOM before deposit.
  • Change notes reopen only the affected gate — in writing.

Version control

Every sample carries a version: style code, fabric code, colour / dip ID, date. Bulk references the PPS revision — not the last WhatsApp photo.

  • Verbal changes are not production instructions.
  • Trim / label / packaging live on the BOM before deposit.
  • One export desk from brief to AQL reduces factory-to-factory gaps.

Critical Path

Gate map from pack intake to ship — with named owners.

Most delays are approval delays. Paste this path next to your launch date; do not start bulk fabric against an unsigned colour or unsigned PPS.

GateOwnerTypical durationUnlocksFail / reopen
01 Pack intakePM + ZIESHINE deskDay 0Sample startIncomplete pack → written open POMs
02 SampleDevelopment7–9 working daysFit loopWrong fabric → re-sample, clock resets
03 Fit sign-offNamed fit owner1–3 loops typicalColour / trim lockVerbal edits invalid · written change note
04 Colour / trim lockNamed colour ownerDip rounds as neededPPS buildUnsigned dip ≠ bulk colour
05 PPSPM / programme ownerSign-off meetingDepositBOM / construction must match sample
06 DepositBuyer / finance30% after PPSBulk clockNo deposit → no cut
07 BulkProduction~25–30 days · swim 30–40Inline QC → AQLChange notes reopen affected gate only
08 AQL / shipQC + logisticsAfter AQL 2.5 / 2.070% balance · FOB ShenzhenFail lot reworked at our cost

Tech pack checklist · Capacity window · submit tech pack brief.