Buyer FAQ
Why choose activewear fabric by activity instead of by fabric name?
Most founders know what the garment has to survive — a deep squat, a pool season, four hours of sun — before they know a fabric name. Starting from the activity fixes the wear requirements and the failure modes first, then narrows the candidate bases and the tests that belong on the PO.
Does “suggested validation” mean the fabric has already passed those tests?
No. Suggested development and validation path. It does not mean every listed fabric has completed every listed test. Every item carries a status: On file (third-party report held for that base), In-house check (our gate before sampling or on the proto and PPS), or Programme gate (specified on your PO and tested per programme).
Which fabric results are on file today?
AquaForm™ 220 has an Intertek report (GZHT03093360): ISO 105-E03 chlorinated-water colourfastness grade 4, UPF 50+ to AATCC TM183 and 30,000+ Martindale rubs. It is not bleach-fast, so care labels say no chlorine bleach. PowerForm™ 215 and AirTouch™ 195 pass an in-house four-way stretch gate and a squat check at ~400 lux before sampling. Other results are programme gates, tested per PO at a lab you accept — SGS, QIMA, BV and Intertek are welcome.
Can one fabric cover yoga and tennis?
Often, yes. PowerForm™ 215 runs both studio leggings and our tennis library. What changes is the validation: tennis whites need an opacity check in light colours, and outdoor programmes add colourfastness to light and UPF before any UPF claim is printed.
My activity is not listed — running, hiking or team kits?
Brief it through the custom sport path. We start from the closest scenario — usually high-intensity training or golf / outdoor — and adjust the validation plan. Swim stays on AquaForm™ and knit lounge on CloudTouch™.
What are MOQ, sample cost and lead time?
Standard 150 pcs / style / colour · library trial from 100 · below 100 +15%. Samples US$50–100 per garment piece · 7–9 working days on library bases. Custom fabric MCQ is typically ~500–1,300 m per colour and construction, and development or dyeing adds ~15–20 days. Bulk runs ~25–30 days after PPS for activewear, ~25–32 days after PPS for knit and typically 30–40 days after PPS for swim.
Fabric Selector · Compare named bases · Fabric test pack · Fabric Lab guides · Custom fabric development