| Pre-prod | Before cut | PPS signed · BOM · shade · size curve | PPS revision | Hold cut · reopen PPS owner |
| Inline 20% | Early run | Construction · seam / binding · first-size POM | PPS construction | Stop & correct · retrain if systemic |
| Inline 50% | Mid run | Measurement stability · shade continuity | Approved dip + size curve | Adjust · quarantine suspect lots |
| Inline 80% | Late run | Appearance · labels / care / hangtags | Packaging BOM | Fix before final AQL |
| Final AQL | End of run | AQL 2.5 / 2.0 sampling | Buyer AQL plan if tighter | Rework at our cost · re-present |
| Pack-out | After AQL clear | Polybags · carton marks · assorts | Approved packing BOM | Hold ship until marks match |
| 3rd-party | Booked window | SGS / QIMA / BV on floor | Visit calendar | Align to production — not empty floor |