Founder First-Order Cash & Calendar

Model the cash before the Instagram grid. Sample fees, colour gates, PPS deposit and a bulk clock that starts when something is signed.

Founders ask for “a price”. What they need first is a cash sequence. Unit FOB is quoted on a locked construction — it is not a public poster number. The sequence below is what we put on the founder desk so drop one does not stall at the wrong wire.

Samples first

US$50–100 / garment piece. A bra + legging is two fees.

Deposit after PPS

30% when the PPS is signed — not when the moodboard is approved.

Plan on 150

Build the P&L on 150 / colour unless a library trial from 100 is confirmed in writing.

Clock from PPS

~25–30 bulk days after PPS for yoga/tennis paths.

Cash stages on a first library colourway

StageTypical published termWhen it hitsFounder note
Sample feeUS$50–100 / garment pieceBefore fit lockConstruction & fabric drive the band. Eligible library fees may credit on confirmed bulk.
Courier / dipsBilled separatelyWith samples / colour roundsTreat as sunk on drop one. Courier never credits.
Library trialFrom 100 pcsSelected library onlyNot sitewide. Needs qualifying block + fabric.
Below 100+15%Written confirmationFeasibility + surcharge — not a published starting price.
Standard MOQ150 / style / colourFirst bulk colourwayDefault P&L assumption.
Custom fabric MCQtypically 500–1300 m+ / colourBefore exclusive cutDo not open five exclusive fabrics on drop one.
Deposit30% after signed PPSPPS approvedNever against an open sketch.
Balance70% after final inspectionQC protocol on the PO clearsFail lots are reworked under the written terms — not argued in chat.
Bulk clock~25–30 days · swim 30–40After PPS + depositAnnounce launch dates from this clock.

Same table lives on For founders — First Order Economics and the deal sheet.

Colour math that breaks founder budgets

Write styles × colours before you fall in love with a palette:

  • 2 styles × 3 colours = 6 gates at 150 → plan inventory as 900 pcs if every gate runs full.
  • A “small” add of one accent colour is another 150 on every style that carries it.
  • A set (bra + legging) is two styles. Matching colours still count per style.

If cash is tight, cut colours before you cut construction quality. Pale colours that need opacity approval should be on the sample list — not discovered in customer photos.

A 90-day path that is boring on purpose

  1. Week 0–1 — NDA if needed · one-page brief · library shortlist on one named hand.
  2. Week 1–2 — paid samples (7–9 working days once locked).
  3. Week 2–4 — fit and colour notes · second sample only if the change list is written.
  4. Week 4+ — PPS → 30% deposit → bulk clock (~25–30 days).
  5. Ship / launch — balance after final inspection · reorder fabric language already filed.

Founders who parallelise five exclusive fabrics in week 0 are usually still waiting on mill dips when the ad account is ready.

What you should never wire against

  • An unsigned sketch or “we will finalise later” tech pack.
  • A verbal MOQ that is not on the PO.
  • A phone photo as the only colour standard.
  • A ship date that predates PPS + bulk days.
  • A recycled or performance claim without scope for that PO.

A worked example without fake unit costs

Suppose: library legging + bra, two colours (black + oat), sizes XS–XL, PowerForm™, US market DTC.

  • Samples: four pieces if you sample both styles in two colours — budget four sample fees in the US$50–100 band, plus courier.
  • Bulk gates: 2 × 2 = four gates. P&L on 150 each unless a written trial from 100 applies to those library styles.
  • Opacity: oat is the approval colour on finished garments — not black alone.
  • Cash spikes: sample outbound → PPS deposit → balance before or at shipment per the PO.

We will quote unit economics on that locked brief. We will not publish a pretend FOB here. Related: sample cost explained · founder first-order desk · brief factories can quote.

FAQ

Why will you not publish FOB on this page?

FOB depends on construction, fabric, trims, size curve and Incoterms. Public average prices mislead founders. We quote against a locked brief.

Can sample fees cover the deposit?

No. Eligible library sample fees may credit against confirmed bulk under quoted terms. The 30% deposit is a separate stage after PPS.

What if I only have budget for 80 pcs?

Below 100 is a written feasibility and typically +15% — not the planning default. Prefer fewer colours at 150 over many colours under-funded.

When should I book ads?

After PPS is real and the bulk clock is on the calendar. Booking ads against a sketch creates refund risk.

Is swim the same calendar?

Swim bulk is often 30–40 days after PPS. Chlorine and lining gates also sit before you announce a date.