Quality agreements prevent email wars. Align AQL, inspection windows and claims evidence before the first bulk PO.
Agreement blocks
- Inline checkpoints (e.g. 20/50/80%)
- Final AQL
- Third-party inspection rights
- Claims window (e.g. 30 days for serious defects)
- Rework / refund rules
Download and brief
Use the deal sheet and capacity pack when forwarding internal stakeholders, then send the quality terms with the first PO draft.
Next steps
- Open the manufacture hub for OEM / private-label programmes.
- Browse related products in the library.
- Review the matching fabric path.
- Download buyer checklists (deal sheet / capacity / cert pack).
- Submit a development brief — Export desk replies within 12 h.